top of page
All Posts
Structuring LDs for Battery Augmentation Blocks.
A lawyer can draft a penalty clause, but if that penalty isn't explicitly tied to the physics of battery degradation, the EPC contractor will simply engineer their way out of paying it. In standard solar PV engineering, Liquidated Damages (LDs) are relatively straightforward. If the EPC delays the Commercial Operation Date (COD) by three weeks, you levy a generic Delay LD. If the Performance Ratio (PR) of the solar array misses the mark during the initial testing period, you
Elizabeth Wokabi
2 days ago3 min read
Why 25°C Datasheets Are Stranding Assets in Africa.
Financial models built in London air-conditioning rarely survive the thermal realities of the African equator. Relying on standard OEM datasheets is a direct path to stranded infrastructure equity. The global energy storage market is currently flooded with "Tier-1" Battery Energy Storage Systems (BESS) designed, tested, and rated for temperate climates. When an EPC pitches a 20MW/40MWh lithium-ion (LFP or NMC) facility in Sub-Saharan Africa, they almost exclusively paste the
Elizabeth Wokabi
2 days ago2 min read
bottom of page
