Pre-FID & Technical Due Diligence FAQ
Pre-FID Technical Forensics & Data Room Audits
Technical Due Diligence TDD & LTA Mandates
EPC Contract Governance & FIDIC Risk Allocation
BESS Architecture & Equatorial Thermal Derating
De-risking a project data room prior to Final Investment Decision (FID) requires reconciling raw simulation files with physical equatorial realities. Forensic audits identify unmodeled yield risks, clipping traps, and scope gaps before capital commitments become legally binding.Simulation Audit: Re-running native PVSyst and DigSILENT PowerFactory files to uncover hidden inverter clipping, unmodeled ground albedo variance, and aggressive satellite irradiance assumptions.Thermal Reconciliation: Recalibrating energy yield predictions against high ambient equatorial temperatures (>35°C–40°C) to account for module voltage drop and inverter thermal derating.Scope Gap Analysis: Cross-referencing Single Line Diagrams (SLDs) against draft EPC contracts to identify missing high-voltage (HV) metering transformers, protection relays, or switchgear interfaces at the Point of Interconnection (POI).
Inverter clipping occurs when the DC array capacity significantly exceeds the AC inverter capacity, causing energy loss during peak irradiance windows. Auditing clipping traps requires evaluating site-specific hourly irradiance against ambient temperature curves.Optimal Sizing Bounds: Verifying DC/AC overloading ratios (typically 1.25x to 1.40x) against localized temperature profiles to prevent thermal curtailment.Midday Clipping Thresholds: Ensuring financial yield models accurately account for clipped energy rather than assuming linear generation curves during peak hours.Inverter Voltage Window: Auditing string configuration to ensure maximum DC voltage remains within the inverter's Maximum Power Point Tracking (MPPT) voltage limits at 60°C cell temperatures.
A standard technical review accepts developer-provided reports at face value. Pre-FID Technical Forensics independently opens, recalculates, and stress-tests the underlying raw data to verify if the physical asset can support the financial model's debt-sizing assumptions.Raw Data Stress Testing: Auditing actual hourly TMY3/satellite irradiance files rather than accepting summary P50/P90 PDF reports.Protection & Auxiliary Load Modeling: Modeling unbudgeted auxiliary power losses (such as BESS HVAC cooling or sub-station parasitic draw) that dilute net energy delivered to the grid.Legal-Technical Mapping: Ensuring that Employer's Requirements (ERs) in draft FIDIC contracts match the exact technical inputs used in the lender's financial model.
Satellite-derived solar resource data (e.g., Solargis, SolarAnywhere) requires calibration against ground-based meteorological stations to eliminate inter-annual variability and systematic bias in P50/P90 energy yield assessments.Ground-Truthing: Cross-referencing satellite GHI and DNI data with high-precision (Class A) on-site pyranometers for a minimum of 12 consecutive months.P90 Debt Sizing: Utilizing calibrated long-term historical records (20+ years) to establish conservative P90 energy yields required by DFIs for debt service sizing.Uncertainty Quantification: Modeling inter-annual climate variability and sensor drift to prevent overestimating base-case generation revenues.
Bifacial PV modules capture light from both sides, relying on rear-side irradiance reflected from the ground (albedo). Failing to audit ground albedo and pitch spacing leads to unearned yield assumptions in developer models.Albedo Sensitivity: Auditing ground reflectivity assumptions (e.g., assuming 25% for dry soil vs. 15% actual ground conditions), which can artificially inflate yield by 3% to 8%.Table Height & Pitch Optimization: Verifying that structural table height (typically >1.2m) and row-to-row pitch allow maximum rear-side diffuse light capture.Rear-Side Shading: Modeling shading losses caused by module mounting torque tubes, structural purlins, and cable trays on the rear bifacial surface.
TECHNICAL FAQ & GOVERNANCE PROTOCOL
De-Risk Equatorial Assets Before FID
Ensure your data room yield assumptions, EPC contracts, and BESS architectures withstand empirical physics before capital is legally committed.