MANDATE I
Pre-FID Technical Forensics
Rapid, uncompromising data room audits executed prior to Final Investment Decision (FID). We reconcile native simulation files, SLDs, and grid impact studies with the baseline financial model to expose thermal losses, inverter clipping traps, and scope gaps before capital is legally committed.
Capital Risk Diagnosis
Pre-Close Financial & Technical Friction
-
Thermal Losses & Clipping Traps: Developer data rooms routinely rely on unverified temperate PVSYST projections. These mask severe 40°C+ ambient yield degradation, HVAC parasitic loads, and hidden inverter clipping constraints that will choke revenue.
-
Component Degradation Misalignment: Unreconciled EPC Bills of Materials (BOM) create dangerous discrepancies between the modeled Tier-1 performance and the actual, accelerated lifecycle fade curves of the deployed equipment.
-
Interconnection Scope Gaps: Unchecked single-line diagrams (SLDs) and preliminary grid impact studies frequently lack required harmonic filters or reactive power limits, creating catastrophic risk of grid-code non-compliance at synchronization.
EXECUTION PROTOCOL
14-DAY FORENSIC DIAGNOSTIC
Pre-FID Data Room Audits | Native Model Recalculation | Component Triage
Technical Execution Methodology
-
Native Model Reconciliation: We do not rely on PDF summaries. We re-simulate the native PVSYST and DIgSILENT files against empirical equatorial field thermodynamics to expose latent thermal losses.
-
BOM & Integration Triage: We systematically audit inverter loading ratios, string architecture, and transformer thermal ratings against your financial baselines to ensure the CapEx budget matches the physical build.
-
Grid Interface Verification: We evaluate SLDs and grid-impact studies to enforce synthetic inertia requirements and guarantee interconnection compliance before you sign the term sheet.