MANDATE I
Pre-FID Technical Forensics
Expose hidden operational risks before financial close.
Rapid, uncompromising data room audits executed prior to Final Investment Decision (FID). We reconcile native simulation files, SLDs, and grid impact studies with the baseline financial model to expose thermal losses, inverter clipping traps, and scope gaps before capital is legally committed.
Capital Risk Diagnosis
Pre-Close Financial & Technical Friction
-
Revenue Choke Points (Thermal Losses & Clipping Traps): Developer data rooms routinely rely on unverified temperate PVSYST projections. These mask severe 40°C+ ambient yield degradation, HVAC parasitic loads, and hidden inverter clipping constraints that will choke revenue.
-
CapEx Discrepancies (Component Degradation Misalignment): Unreconciled EPC Bills of Materials (BOM) create dangerous discrepancies between the modeled Tier-1 performance and the actual, accelerated lifecycle fade curves of the deployed equipment.
-
Synchronization Failure (Interconnection Scope Gaps): Unchecked single-line diagrams (SLDs) and preliminary grid impact studies frequently lack required harmonic filters or reactive power limits, creating catastrophic risk of grid-code non-compliance at synchronization.
EXECUTION PROTOCOL
14-DAY FORENSIC DIAGNOSTIC
Pre-FID Data Room Audits | Native Model Recalculation | Component Triage
Technical Execution Methodology
-
Uncovering Latent Losses (Native Model Reconciliation): We do not rely on PDF summaries. We re-simulate native PVSYST and DIgSILENT files in strict accordance with IEC 61724 standards, applying empirical equatorial thermodynamics to expose latent thermal losses.
-
Validating the Physical Build (BOM & Integration Triage): We systematically audit inverter loading ratios, string architecture, and transformer thermal ratings against your financial baselines to ensure the CapEx budget matches the physical build.
-
Guaranteeing Compliance (Grid Interface Verification): We evaluate SLDs and grid-impact studies to enforce synthetic inertia requirements and guarantee interconnection compliance before you sign the term sheet.
